N251-066 TITLE: Carbon-Carbon Modular Structures

OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Advanced Materials;Hypersonics;Sustainment

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.

OBJECTIVE: Develop the manufacturing capability to create precise, rugged, and consistent high tolerance carbon-carbon (C/C) structures that allow for modularity of a hypersonic vehicle.

DESCRIPTION: Current C/C technology is very expensive, time consuming, and difficult to produce. These factors limit the ability to perform research and development for modification to current designs. New designs will allow for more advanced vehicles. The Conventional Prompt Strike (CPS) Program desires a manufacturing capability to create very strict tolerances that allows for different architectures/designs for hypersonic vehicles. The ability to modularly construct, mold, carve, form, or alter the C/C material in the manufacturing process is of interest. In the case of additive manufacturing capabilities, there is high risk of failure to withstand the shock, vibration, heat, and other environmental conditions of hypersonics. This new manufacturing capability shall provide significant proof of concept to meet these requirements. The C/C manufacturing capability should have mitigations for these considerations along with all other capability considerations. This capability shall follow standard manufacturing readiness level (MRL) progression.

Work produced in Phase II may become classified. Note: The prospective contractor(s) must be U.S. owned and operated with no foreign influence as defined by 32 U.S.C. § 2004.20 et seq., National Industrial Security Program Executive Agent and Operating Manual, unless acceptable mitigating procedures can and have been implemented and approved by the Defense Counterintelligence and Security Agency (DCSA) formerly Defense Security Service (DSS). The selected contractor must be able to acquire and maintain a secret level facility and Personnel Security Clearances. This will allow contractor personnel to perform on advanced phases of this project as set forth by DCSA and SSP in order to gain access to classified information pertaining to the national defense of the United States and its allies; this will be an inherent requirement. The selected company will be required to safeguard classified material during the advanced phases of this contract IAW the National Industrial Security Program Operating Manual (NISPOM), which can be found at Title 32, Part 2004.20 of the Code of Federal Regulations.

PHASE I: Demonstrate the feasibility of the C/C manufacturing capability to demonstrate modular integration of aeroshell components while maintaining robust structural integrity of the entire system. Show the design considerations such as size of piece that can be constructed, thermal limits, shear limits, compression limits, tensile strength limits, etc. Compare these metrics to current state of the art C/C manufacturing capabilities and other C/C processes. Show the trade space between the process presented and these other processes. For consideration of Phase II, there is significant emphasis on the ability to have a technical and rigorous process flow for manufacturing that demonstrates the repeatability and reliability of the process. The Phase I Option, if exercised, will include the initial design specifications and capabilities description to build a prototype solution in Phase II.

PHASE II: The modular C/C structure shall be tested with multiple environmental conditions. A successful demonstration shall be presented by the end of the Phase II. Unlike technology readiness levels (TRLs), MRL requires testing similar environments throughout Phase II. The Technical Point Of Contact (TPOC) shall approve the validity of the test environment meets the requirements given in Phase II.

It is probable that the work under this effort will be classified under Phase II (see Description section for details).

PHASE III DUAL USE APPLICATIONS: Support the government in transitioning the technology for government use.

The transitioned product is expected to be able to support current and future weapon and space systems, as well as a wide range of other air, land, and sea-based systems. Commercial applications should be considered for transition (i.e., ocean exploration, space exploration, commercial autonomous vehicles, and mapping systems). The primary objective of this project is for transition to defense contractors for high-speed weapons and space systems. To meet these needs, maturation and packaging of the technology to meet practical size, weight, and power constraints will be required. Extreme environments may require special considerations to conform to airframe shape and shielding from the aerothermal environment.

REFERENCES:

1. Smeacetto, Federico;, Ferraris, Monica and Salvo, Milena. "Multilayer coating with self-sealing properties for carbon–carbon composites." Carbon 41.11, 2003, pp. 2105-2111.

2. Paek, Sung Wook; Balasubramanian, Sivagaminathan and Stupples, David. "Composites Additive Manufacturing for Space Applications: A Review." Materials 15.13, 2022, p. 4709.

3. "National Industrial Security Program Executive Agent and Operating Manual (NISP), 32 U.S.C. § 2004.20 et seq. (1993)." https://www.ecfr.gov/current/title-32/subtitle-B/chapter-XX/part-2004

KEYWORDS: Novel; Creative; Innovative; Advanced; Rugged; Hypersonic; Manufacturing; Additive Manufacturing; Modular; Carbon-Carbon; Carbon Structures: Embedded; Aerospace

TPOC 1: SSP SBIR POC
Email: [email protected]


** TOPIC NOTICE **

The Navy Topic above is an "unofficial" copy from the Navy Topics in the DoD 25.1 SBIR BAA. Please see the official DoD Topic website at www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations for any updates.

The DoD issued its Navy 25.1 SBIR Topics pre-release on December 4, 2024 which opens to receive proposals on January 8, 2025, and closes February 5, 2025 (12:00pm ET).

Direct Contact with Topic Authors: During the pre-release period (December 4, 2024, through January 7, 2025) proposing firms have an opportunity to directly contact the Technical Point of Contact (TPOC) to ask technical questions about the specific BAA topic. Once DoD begins accepting proposals on January 8, 2025 no further direct contact between proposers and topic authors is allowed unless the Topic Author is responding to a question submitted during the Pre-release period.

DoD On-line Q&A System: After the pre-release period, until January 22, at 12:00 PM ET, proposers may submit written questions through the DoD On-line Topic Q&A at https://www.dodsbirsttr.mil/submissions/login/ by logging in and following instructions. In the Topic Q&A system, the questioner and respondent remain anonymous but all questions and answers are posted for general viewing.

DoD Topics Search Tool: Visit the DoD Topic Search Tool at www.dodsbirsttr.mil/topics-app/ to find topics by keyword across all DoD Components participating in this BAA.

Help: If you have general questions about the DoD SBIR program, please contact the DoD SBIR Help Desk via email at [email protected]


[ Return ]